Events Calendar
Browse and enroll in our scheduled events
2011-11-05 Technical visit to DSD - Lai Chi Kok Drainage Tunnel
|
Seminar Date: |
5th November 2011 (Sat) |
||||||||
Program title |
Technical visit to DSD - Lai Chi Kok Drainage Tunnel |
||||||||
|
Organizer : |
HKIUS |
||||||||
|
Supporting organization : |
CCPDC; PolyU; DSD; |
||||||||
|
Time and Venue |
9:30 to 11:30 a.m. DSD - Lai Chi Kok Drainage Tunnel Meet at the conference room on G/F inside AECOM’s Supervising Officer’s Representative Office (SOR) at 39 King Lam Street (location as shown on map below). Parking is not provided for site visit attendees. Latecomers will NOT be entertained. |
||||||||
|
Safety Equipment |
Attendees please bring their own Safety Helmet, Safety Reflective Vest, Safety Shoes and a valid Green Card (or HKIE or HKIUS Corporate Membership Card) if available. | ||||||||
|
Speaker(s) |
Ir Pakin Cheung, Engineer, Project Management Division, DSD Ir Vincent Lee, AECOM (RE of DSD Contract) |
||||||||
Program highlights |
Due to inadequate capacity of the existing drainage systems, Sham Shui Po, Cheung Sha Wan and Lai Chi Kok areas are susceptible to flooding during heavy rainstorms. The Lai Chi Kok Transfer Scheme is a drainage tunnel that will capture rainwater from the upper catchment in West Kowloon and discharge it into Victoria Harbor to alleviate flooding of the low lying, developed areas of Kowloon. The project comprises the construction of a drainage tunnel of about 3.7km in length and about 4.9m in diameter from Chak On Estate to Victoria Harbor near Stonecutters Island; six intakes and about 270m of connection adits; a stilling basin and an outfall structure; and slope stabilization works. The tunnels will be constructed by TBM and will pass through rock, mixed ground and soft ground strata. The connection adits will be constructed by blasting techniques. Depending on the ongoing site activities, attendees to the site visit may have a unique opportunity to get a close up view of the TBM operation or the completed section of the drainage tunnel.
|
||||||||
|
Registration contact |
Please complete the “Event Registration Form” and return via email to info@hkius.org.hk or fax to : 2618 4500 | ||||||||
|
Enquiries |
Email: info@hkius.org.hk / Tel: 2690 3899 | ||||||||
|
Registration Fee |
Entrance is free to all but priority will be given to members of the supporting organizations. CPD certificate can be issued when required, free for Elected (Voting) and Full-time studying Young Members of CCPDC, HKIUS & UTI members. Otherwise, an Administration Fee of HK$100 will be charged per issue. |
||||||||
|
Limited No. of participant |
25 |